Mold Fabrication:
|
Time
|
|
Base
|
Lathe Core:
Mill Core:
Lathe Cavity:
Total Tool Change
Machine Setup
|
7m
3m
2m
1m
10m
|
Dome
|
Lathe:
Mill:
Lathe Tool Change:
Machine Setup:
|
1m 12.90s
2.04s
30s
10m
|
Spinner
|
Core:
Cavity:
Total Tool Change:
Machine Setup:
|
30m
8m
30s
10m
|
Earth
|
Core:
Cavity:
Total Tool Change:
Machine Setup
|
3m 6.44s
3m 15.9s
1m
10m
|
Ring
|
Lathe Cavity:
Lathe Core:
Core Mill:
Tool Changes:
Machine Setup:
|
3m 6.44s
5m 37.68s
7m 58.51s
1m
10m
|
Total
|
|
133min
|
Part Fabrication
|
Time/1 yoyo
|
Time/100 yoyos
|
Base
|
131s
|
3.6hrs
|
Dome
|
10s (not including
cutout)
|
20m (Including loading
material)
|
Spinner
|
105s
|
2.9 hrs
|
Earth
|
90s
|
2.5hrs
|
Ring
|
80s
|
2.2 hrs
|
Assembly
|
215s
|
8.3hrs
|
Total
|
631s
|
20 hrs
|
We used the injection molding notes from lecture to evaluate
process time for making each part. Thicker take longer to inject, pack, and
cool so we accounted for additional time in our thicker parts. We used
Mastercam to automatically calculate time to cut the molds, and included setup
and tool change time for each mold in order to keep our time estimates
conservative. We estimated assembly time thinking about each part being added
in assembly line fashion. The assembly time accounts for stamping paint on the
Earth piece, putting together all the pieces for both sides of the yoyo,
screwing them together, and tying on the string. In conclusion the time from
making the molds to full assemble will be 20 hours and the time to make the
molds will be 2 hours and 13 minutes. This has extended our time allotted to manufacture the molds by 2 days, everything else remains on the same schedule.
Here is the link to our updated schedule.