Manufacturing Time Estimate


Mold Fabrication:
Time
Base
Lathe Core:
Mill Core:
Lathe Cavity:
Total Tool Change
Machine Setup
7m
3m
2m
1m
10m
Dome
Lathe:
Mill:
Lathe Tool Change:
Machine Setup:
1m 12.90s
2.04s
30s
10m
Spinner
Core:
Cavity:
Total Tool Change:
Machine Setup:
30m
8m
30s
10m
Earth
Core:
Cavity:
Total Tool Change:
Machine Setup
3m 6.44s
3m 15.9s
1m
10m
Ring
Lathe Cavity:
Lathe Core:
Core Mill:
Tool Changes:
Machine Setup:
3m 6.44s
5m 37.68s
7m 58.51s
1m
10m
Total

133min
Part Fabrication
Time/1 yoyo
Time/100 yoyos
Base
131s
3.6hrs
Dome
10s (not including cutout)
20m (Including loading material)
Spinner
105s       
2.9 hrs
Earth
90s
2.5hrs
Ring
80s
2.2 hrs
Assembly
215s
8.3hrs
Total
631s
20 hrs

We used the injection molding notes from lecture to evaluate process time for making each part. Thicker take longer to inject, pack, and cool so we accounted for additional time in our thicker parts. We used Mastercam to automatically calculate time to cut the molds, and included setup and tool change time for each mold in order to keep our time estimates conservative. We estimated assembly time thinking about each part being added in assembly line fashion. The assembly time accounts for stamping paint on the Earth piece, putting together all the pieces for both sides of the yoyo, screwing them together, and tying on the string. In conclusion the time from making the molds to full assemble will be 20 hours and the time to make the molds will be 2 hours and 13 minutes.  This has extended our time allotted to manufacture the molds by 2 days, everything else remains on the same schedule.  

Here is the link to our updated schedule.   