B. In class, there were example yo-yo base molds and a few of their injection molded parts. From these examples, I measured the injection molded base outer diameters and compared them to the outer diameter on their respective molds. From this I saw that the base molds shrunk around 2% in size from their mold sizes. Thus, we decided to have a scale factor of 1.02 for the base mold.
C. Process Plan for yo-yo base mold
Step
|
Operation
|
Machine
|
Tool
|
Justification
|
Cavity Mold
|
||||
1
|
Bore cavity mold Rough Pass
|
PUMA Lathe
|
T1010
0.03125 Large Bore
|
Use bore tool to make a rough
pass and cut out the design for the base of the yoyo cavity
|
2
|
Bore cavity mold finish pass
|
PUMA Lathe
|
T1010
0.03125 Large Bore
|
Use bore tool again on final
pass to smooth mold
|
|
|
|
|
1m 16.94s
|
3
|
Make runner from sprue to part
|
Protrak Mill
|
#9 sphere endmill
|
Use the sphere endmill to create the runner from the sprue to the
part
|
Core Mold
|
||||
1
|
Lathe rough pass core mold
|
PUMA Lathe
|
T0101
Turning Face tool
|
Turn down the face of the
mold to match the core of the base part of the yoyo
|
2
|
Lathe finish pass core mold
|
PUMA Lathe
|
T0101 Turning Face tool
|
Finish pass over previous cut
to smooth and clean
|
3
|
Lathe Groove rough pass
|
PUMA Lathe
|
T0909 Trepan Tool
|
Turn the center of the part down to match the central axis and
mounting point for the earth part onto the base mold.
|
4
|
Lathe groove finish pass
|
PUMA Lathe
|
T0808
Trepan tool
|
Smooth out previous step using a slightly smaller radius trepan
|
5
|
Mill Peck Drill
|
Protrak
Mill
|
3/16” flat endmill
|
Drill out the center shaft of the core mold
|
6
|
Circle Mill for center shaft
|
Protrak
Mill
|
Circle mill
|
Fully mills out center shaft
|
7
|
Center drill for ejector pin
holes
|
Protrak
Mill
|
#13 drill: #2 center drill
|
Preps ejector pin holes to be drilled
|
8
|
Drill ejector pin holes
|
Protrak
Mill
|
#17 Drill
|
Drills out holes for the ejector pins
|